RITOM (CH)
Nr. 1 x 6 jets vertical Pelton + Alternator 70 MVA 50 Hz

Year: 2023 - ongoing

Client: Voith Hydro GmbH, Heidenheim ad der Brenz (GE)

HPP owner: RITOM SA (consortium SBB + AET)

  • Complete mechanical installation of Pelton turbine

  • Complete mechanical installation of alternator 70 MVA, 50 Hz

  • Complete manufacturing and installation of HPU governor piping, cooling water system piping, oil mist suction piping, HP lifting and braking system piping.

WhatsApp Image 2023-12-12 at 14.37.09 (3).jpeg

RITOM (CH)
Nr. 1 x 5 jets vertical Pelton + Alternator 70 MVA 16,3 Hz

Year: 2023 - ongoing

Client: Voith Hydro GmbH, Heidenheim ad der Brenz (GE)

HPP owner: RITOM SA (consortium SBB + AET)

  • Complete mechanical installation of Pelton turbine

  • Complete mechanical installation of alternator 70 MVA, 16 Hz, stator in 3/3 total weight 360 tons

  • Complete manufacturing and installation of HPU governor piping, cooling water system piping, oil mist suction piping, HP lifting and braking system piping.

IMG-20231122-WA0002.jpg

RITOM (CH)
Nr. 1 two-stages pump + Motor 70 MVA 50 Hz

Year: 2023 - ongoing

Client: Voith Hydro GmbH, Heidenheim ad der Brenz (GE)

HPP owner: RITOM SA (consortium SBB + AET)

  • Complete mechanical installation of two stages pump

  • Complete mechanical installation of motor 70 MVA, 50 Hz

  • Complete manufacturing and installation of HPU governor piping, cooling water system piping, oil mist suction piping, HP lifting and braking system piping.

IMG-20230331-WA0013.jpg

PORTO DELLA TORRE
Nr. 1 Kaplan turbine Drunner=6700 mm

Year: 2022 - ongoing

Client: Voith Hydro S.r.l., Cinisello Balsamo (IT)

HPP owner: ENEL GREEN POWER

  • Dismantling of existing turbine, decomissioning of piping related to HPU governor and cooling system.

  • Installation of new refurbished turbine.

  • Complete manufacturing and installation of HPU governor piping, cooling water system piping, oil mist suction piping, HP lifting and braking system piping.

_DSC0319_B.jpg

ISOLA SERAFINI (PC)
Nr. 2 Kaplan Turbines Drunner=7600 mm

Year: 2020 - 2023

Client: Franco Tosi Meccanica

HPP Owner: Enel Green Power

  • Dismantling of the two existing turbines and disassembly of the alternator

  • Installation of new turbines, replacement of existing alternator

  • Dismantling of existing HPU and installation of new HPU with piping

  • Dismantling of cooling system and construction of new plant

Pelos 3.jpg

PELOS (BL)
Nr. 1 Syncronous Alternators 60 MW

Year: 2022

Client: General Electric Renewables

HPP Owner: Enel Green Power

  • Dismantling of existing 60 MVA alternator coupled to a vertical Francis runner

  • On site installation of new poles on new rotor spider

  • New stator installation

  • Construction and installation of piping for cooling system

  • Allignment of the entire group, including turbine runnner

Lasa.jpg

LASA (BZ)
Nr. 1 Syncronous Alternators 70 MW

Year: 2022

Client: General Electric Renewables

HPP Owner: ALPERIA S.p.A.

  • Dismantling of existing 70 MW twin Pelton runners

  • Dismantling of 2/2 existing stator to be later demolished

  • Conservative dismantling of 12 poles on existing rotor (2 to be conserved, 10 to be demolished later)

  • On site installation of new poles on new generator rotor spider

  • On site installation of both new turbine shafts on new generator rotor spider

  • New generator stator 2/2 installation

  • Construction and installation of piping for bearings injection circuit

  • Allignment of the entire group, including turbine runnner

Torbole6.jpg

TORBOLE (TN)
Nr. 1 Francis Turbine 70 MW

Year: 2022

Client: Franco Tosi Meccanica

HPP Owner: HDE S.r.l.

  • Conservative dismantling of existing 80 MVA alternator rotor coupled to a reversible Francis runner

  • Conservative dismantling of existing 2000 mm rotative valve with sealing ring

  • Installation of new 70 MW Francis turbine

  • Installation of new HPU and construction of all related piping

  • Reassembly of existing alternator

  • Reassembly of existing valve after refurbishment at workshop

IMG-20200207-WA0001.jpg

ANAPO (SR)

Nr. 1 Syncronous Alternators 125 MW

Year: 2019 - ongoing

Client: General Electric Renewables

HPP Owner: Enel Green Power

  • Dismantling of existing stator

  • Site construction and installation of new stator

  • Shaft alignement

20191215_110859.jpg

MORASCO (VB)

Nr. 2 Syncronous Alternators 26 MW

Year: 2019 - ongoing

Client: Andritz Hydro

HPP Owner: Enel Green Power

  • On-site stator windings make over

  • On-site rotor poles assembly

  • On-site construction cooling system piping

  • Construction of dismantling gear

IMG_20200302_074603.jpg

ARDENNO (SO)

Nr. 1 twin Pelton Turbine with Syncronous Alternator 56 MW

Year: 2019 - ongoing

Client: HEAS

HPP Owner: Enel Green Power

  • Dismantling and Assembly of two MIV

  • Dismantling and Assembly of jet-deflector linkage

  • Installation of new HPU for both turbine and MIV

  • Piping installation for both MIV and Turbine HPU

IMG_20200306_133403_edited.jpg

STAZZONA (SO)

Nr. 1 Rotative guard valve DN1850 PN17

Year: 2020

Client: A2a

HPP Owner: A2a

  • Disassembling of MIV dismantling joint 

  • All gaskets replacement

  • Installation of a new stainless steel sliding ring

  • Installation of new stainless steel sealing ring bolted on MIV rotor

IMG-20200209-WA0008.jpg

CARDANO (BZ)

Nr. 1 Rotative guard valve  DN1900 PN20

Year: 2019

Client: General Electric Renewables

HPP Owner: Alperia

  • Dismantling of existing penstock final section and MIV

  • Assembly of new penstock final section and MIV

  • Installation of new HPU and its piping

IMG_20190125_143931.jpg

PARRE (BG)

Nr. 1 Kaplan turbine Drunner=1450 mm

Year: 2019

Client: Techydro S.r.l.

HPP Owner: Pozzi Electa S.p.A.

  • Dismantling of the 5-blade Kaplan impeller at the plant

  • Dismantling of alternator Guide & Thrust bearing

  • Complete refurbishment of the runner and blade servomotor

  • Execution of pressure and sealing tests at our shed

  • Reassembly of the impeller on the plant and bearing

DSCN0574.JPG

BARREA (AQ)

Nr. 1 S-type Kaplan turbine

Anno: 2017

Client: Hydroenergia S.r.l.

HPP Owner: Enel Green Power

  • Pre-assembly of Nr. 1 horizonta Kaplan turbine at our shed

  • Installation of the turbine at the plant

IMG_8010.JPG

TORBOLE (TN)

Nr. 1 Syncronous Alternator 65 MW

Year: 2017

Client: Alstom Power Italia S.p.A.

HPP Owner: Hydro Dolomiti

  • General refurbishment of Group 1 alternator

  • On-site welding of new stator

  • On-site stator winding

006.jpg

SONDRIO (SO)

Nr. 1 Pelton turbine

Year: 2016

Client: Andritz Hydro S.r.l.

HPP Owner: Enel Green Power

  • runner replacement

  • needles and noozle replacement 

IMG_8155.JPG

PREMADIO (SO)

Nr.1 Syncronous Alternator 80 MW

Year: 2015

Client: Alstom Renewables

HPP Owner: A2a

  • complete alternator dismantling

bottom of page